top of page

Done!

It has taken another 50 hours of stuffing around. All I had to do was put the wings on and connect everything up..........sounds simple doesn't it? Well the reality of squeezing my fat arse upside down in the nose inserting bolts, split pins, connecting airlines, etc, etc is hard work. I ended up machining up aluminium 'bullets' to help line up the wing bolts as I couldn't get the bolts through on my first attempt. I also discovered that when both wheel spats were fitted they looked like a blind person had installed them. At home I didn't have room to assemble it properly and I'd made the undercarriage legs before I'd even started on the fuselage. Trying to get all the angles correct when welding and drilling the steel fittings with only basic equipment, well I goofed it. I ended up grinding off the attachment lug, and remaking it. I used a spirit level to ensure it was the same each side. The aircraft has been final inspected, weighed and balanced, photographed and all the paperwork completed and sent off for approval and issuing of a test flying approval. So hopefully in the next 2 or 3 weeks I will get that treasured bit of paper back.

Sitting in front of the hangar waiting for certification.

About Me.

We are a couple who know that life is far to important to take seriously. Which means that we encourage readers of this site to stop doing it and get outside and explore what life has to offer without reading our views about it!

  • Black Facebook Icon
  • Black Instagram Icon
  • Black Twitter Icon
Never Miss a Post!
bottom of page